LEED-NC and building addiitions

Questions, answers, and discussion specifically related to practical working issues with LEED and other robust green certification systems.

LEED-NC and building addiitions

Postby Lawrence » Fri Jan 09, 2009 1:27 pm

A client is asking that we design a small addition to an existing building, and get the project LEED certified. Now, the existing building was not built very efficiently. The new addition will be, of course, but it is only 10% of the building footprint.

My question is: How do we figure the new building vs. old in calculating LEED points? For example, in energy modeling, does the entire building have to be better than ASHRAE 90.1, or just the new addition (there is no way the existing building could meet ASHRAE 90.1) In lighting credits, does the entire building have to be under so-many watts per square foot, or just the new addition? (the existing building would not meet the maximum watts/sft)

Much of the existing building is daylit - do we count the whole building when figuring daylighting, or just the new addition?

I told the client that if USGBC wants us to count the entire building, then they'd have an uphill battle getting the project certified. If only the new addition is counted, then it would be straightforward.

--Lawrence Lile, PE, LEED AP
Lawrence
 
Posts: 1
Joined: Fri Jan 09, 2009 1:18 pm

Return to LEED and Green Certification Forum

Who is online

Users browsing this forum: No registered users and 2 guests

User Control Panel

Login

Who is online

In this forum zone there are 2 users online :: 0 registered, 0 hidden and 2 guests (based on users active over the past 5 minutes)
Most users ever online was 508 on Thu Jun 25, 2009 11:21 am

Users browsing this forum: No registered users and 2 guests
DesignCommunity   ·   ArchitectureWeek   ·   Great Buildings   ·   Archiplanet   ·   Books   ·   Blogs   ·   Search
Special thanks to our sustaining subscribers Building Design UK, Building Design News UK, and Building Design Tenders UK.