|
View previous topic :: View next topic
|
| Author |
Message |
River Rat
Joined: 03 Sep 2007 Posts: 3
|
Posted: Mon Sep 03, 2007 9:38 am Post subject: PUTTING UP NEW SHIELD ( DRAINAGE PROBLEM ) |
    |
|
In a few weeks I will be putting a 13' X 15' shied up, but before it goes up I need to put a base of stone for drainage under it. In heavier rains water stands under the old shield. I need to address this problem for this is where the new one is going. It is on a slight slop with a hill behind it, yes it is getting hit by 2 direction so I would like to put a 6 inch base under it.
If you can gave me some advice on how to do this it would be very helpful.  |
|
| Back to top |
|
 |
|